BEGIN:VCALENDAR VERSION:2.0 BEGIN:VEVENT SUMMARY:Fall 2016 Lake Harding Drawdown DTSTART;TZID=US/Eastern:20160924T000000 DTEND;TZID=US/Eastern:20160924T000000 RRULE:FREQ=DAILY;UNTIL=20161102T000000 DESCRIPTION:

A drawdown of Bartletts Ferry or Lake Harding is scheduled for this September & October assuming adequate flow conditions exist in the Chattahoochee River to refill the reservoir. The reservoir will start down Saturday, September 24th and reach the drawdown bottom elevation of 513’ by October 1st. The lake refill will begin on November 1st and reach full pool based on inflows.

LOCATION:Bartletts Ferry Dam END:VEVENT END:VCALENDAR